Preserving the Mobile Bay Estuary Through Headwater Protection

Este artigo tem acesso aberto
Abstract
The Mobile Bay National Estuary Program (MBNEP) was awarded an EPA Healthy Watershed Grant in 2018 to advance the strategic protection of healthy headwater habitats located within the Mobile Bay watershed. The Mobile Bay watershed contains 75% of the first and second order stream catchments that eventually drain into Mobile Bay, which are important headwater habitats that have large effects on the water quality and ecological health of the entire bay, estuary, and coastal Alabama waters. This presentation provides a video overview of the Accelerating Headwater Land Protection in the Mobile Bay Basin project and its achievements to date.
Abstract ID:
bbs20461
Type of Presentation
Moffatt & Nichol

Abstracts With Same Type

Artigo ID
Título do artigo
Tópico do artigo
Tipo de artigo
Primary Author
bbs20306
Oral Presentation
Dr. SATHISHKUMAR SAMIAPPAN
bbs20307
Oral Presentation
Mr. Andrew Shamaskin
bbs20298
Oral Presentation
Prof. Joann Mossa
bbs20311
Oral Presentation
Kindall Calhoun
bbs20490
Oral Presentation
Dr. Karen Bareford
70 visits